
FLORIDAASPHALT PAVING.
Residential driveways, commercial parking lots, private roads, resurfacing, and sealcoating across Florida — built for intense sun, heavy rainfall, and demanding drainage conditions.
PAVING FOR FLORIDA CONDITIONS.
Florida pavement lives in a completely different environment than New England asphalt. Instead of freeze-thaw cycles and snow, your driveway or parking lot faces months of intense sun, sustained heat, and frequent heavy rainfall. That combination ages surfaces faster and makes water management one of the single biggest factors in how long your pavement lasts.
HER Asphalt brings residential and commercial paving to property owners across Florida. Every project starts with a thorough on-site evaluation — looking at sun exposure, drainage, base condition, and how the surface is actually used — before we recommend an approach. No one-size-fits-all fix.
FLORIDA CONDITIONS CHANGE THE JOB.
The forces working against Florida pavement are different from the ones up north. Here's what we look at during every evaluation.
High Surface Temperatures
Florida's sustained heat can raise asphalt surface temperatures well above air temperature, placing different stress on the binder and surface than a northern climate would. We account for that exposure during evaluation.
Intense Sunlight & Oxidation
Year-round sun exposure contributes to oxidation, which can dry out and age the asphalt binder over time. This is one of the biggest long-term factors for Florida pavement — and a key reason sealcoating matters here.
Heavy, Frequent Rainfall
Frequent downpours mean water is on and around the pavement constantly during the wet season. How that water moves — or doesn't — has a direct impact on how long the surface lasts.
Water Intrusion
When drainage is poor or the base is compromised, water works underneath the surface and accelerates deterioration. We look at where water is going during every Florida site evaluation.
High-Traffic Surfaces
Parking lots and commercial surfaces take daily wear from vehicles, turning movements, and heat. Traffic patterns and surface condition both factor into the recommended approach.
SERVICES AVAILABLE HERE.
Each service below is available to Florida property owners. We don't rewrite the full service page here — instead, here's why each one matters in a Florida context.

New asphalt installation evaluated for Florida's heat, sun, and drainage before we recommend an approach.
VIEW SERVICE
Driveways built to hold up under daily sun exposure and heavy Florida rainfall, with grading that moves water away from the surface.
VIEW SERVICE
Commercial lots engineered for traffic loads, standing-water prevention, and a clean professional appearance.
VIEW SERVICE
Shared private roads and HOA surfaces planned with drainage along the full length for Florida's frequent downpours.
VIEW SERVICE
An overlay can restore a sun-aged surface when the existing pavement and base remain structurally suitable.
VIEW SERVICE
When moisture and heat have compromised the base, a full digout rebuilds the surface from the ground up.
VIEW SERVICE
A protective sealcoat helps shield Florida pavement from intense UV, oxidation, and oil exposure.
VIEW SERVICE
Crisp stall lines, directional arrows, and markings that keep commercial lots organized and safe.
VIEW SERVICE
A practical, cost-conscious recycled surface for suitable driveways, private roads, and storage areas.
VIEW SERVICEDRIVEWAYS BUILT FOR SUN & RAIN.
A Florida driveway takes daily sun, heat, and heavy rainfall. How it's graded — and where the water goes during a downpour — matters as much as the asphalt itself. We evaluate slope, runoff, and base condition before recommending new paving, resurfacing, or a full rebuild.
- New driveway paving and full replacement
- Resurfacing where the existing base remains suitable
- Grading that directs water away from the surface
- Surface appearance and long-term maintenance planning


COMMERCIAL LOTS THAT PERFORM.
A commercial parking lot is working infrastructure. It handles daily traffic, turning vehicles, heat, and rain — all while representing your business. We plan for drainage, traffic flow, surface durability, and a clean professional finish, then coordinate line striping once the surface is ready.
- New commercial lot installation and resurfacing
- Full reconstruction where the base has failed
- Drainage and standing-water prevention
- Line striping coordinated with the finished surface

WATER HAS TO GO SOMEWHERE.
In Florida, drainage isn't an afterthought — it's often the difference between pavement that lasts and pavement that fails early. Frequent, heavy rainfall means water is constantly testing how your surface is graded and where runoff is directed.
When water pools on a surface or works its way underneath, it accelerates deterioration from the base up. That's why we look at grading, runoff direction, standing water, and underlying conditions during every site evaluation — before we recommend a single thing.
We focus on paving and site-evaluation considerations. We don't represent this as engineering or drainage-design services. If a project requires engineered drainage design, we'll let you know.
SEALCOATING MATTERS IN FLORIDA.
Because of Florida's intense sun and UV exposure, sealcoating is more than cosmetic here. A quality sealcoat helps protect the surface from oxidation, moisture, and oil — the same forces that age Florida pavement faster than northern surfaces.
It also refreshes the appearance of sound pavement. It won't make asphalt permanent, and it won't fix structural base problems — but as part of a regular maintenance plan, it's one of the most relevant services for Florida property owners.

WHY HER ASPHALT.
Third-Generation Paving Experience
More than a decade of hands-on field experience, applied to Florida's heat, sun, and rainfall conditions.
Woman-Owned & Operated
Led by Betsy Stanley, with direct communication from estimate through installation.
Residential & Commercial Capability
From single driveways to commercial parking lots — one contractor for the full scope of your project.
Free Estimates & Site Evaluations
Every Florida project starts with a free on-site evaluation of conditions, drainage, and base.
No Deposit Under $50K
No deposit is required on projects under $50,000 — straightforward, transparent terms.
Workmanship Warranty
A standard one-year workmanship warranty on our installation work.
WHERE WE PAVE IN FLORIDA.
We serve residential and commercial property owners across Florida. Rather than publish a generic city list, we confirm service availability for each project individually — so you get an honest answer about your specific location.
Contact HER Asphalt to confirm availability for your Florida project. Include your address when you request an estimate and we'll let you know directly.
FLORIDA FAQ.

PLANNING AN ASPHALT
PROJECT IN FLORIDA?
Get a free, transparent estimate for your Florida paving project. No deposit required on projects under $50,000.

